Alta EI

Office Locations

We usually respond within 24 hours. Alternatively you’re welcome to call our offices.

4940 S. Wendler Dr. Suite 150 Tempe AZ 85282

2025 W Ruthrauff Rd Ste 125, Tucson, AZ 85705

440 N Main Street, Suite 202, Florence, AZ 85132

2700 East Fry Boulevard, Suite C-1, Sierra Vista, Arizona 85635

2201 N. Gemini Dr., Suite 129, Flagstaff, AZ 86001

ADOT I-10 Tucson

ClientGranite Construction Co.
LocationTucson, AZ
ServiceSurvey
Project Details

Alta EI is contracted with Granite Construction Company to support improvements to Interstate 10 between Ruthrauff Road and Ina Road in Tucson. The project is being delivered for the Arizona Department of Transportation (ADOT) in coordination with the Federal Highway Administration (FHWA).

Alta EI is providing construction staking services for key roadway, bridge, and interchange elements associated with this major interstate corridor improvement. Project work includes reconstructing and widening nearly four miles of I-10 from three travel lanes in each direction to four, as well as constructing auxiliary lanes to create two-lane entrance and exit ramps at all interchanges within the project limits. Additional improvements include replacement of the existing inside shoulder pavement to accommodate an additional travel lane in each direction near the Ina Road interchange.

The scope also encompasses reconstruction of the Orange Grove Road interchange to increase vertical clearance beneath I-10, as well as reconstruction of the Cañada del Oro Wash and Rillito River I-10 bridges to provide sufficient hydraulic and structural clearance. New bridge construction is being performed to carry Sunset Road traffic over the Union Pacific Railroad (UPRR) and the Rillito River, along with construction of a new access path connecting Sunset Road to the Chuck Huckelberry Loop multi-use trail system.

Upon completion of the project, I-10 will provide four continuous travel lanes in each direction from 22nd Street to Ina Road, significantly improving traffic flow, safety, and regional mobility. Construction activities began in February 2023, with substantial completion anticipated by the end of 2025.

Alta is your environmental & infrastructure partner

Give Us A Call

Schedule A Consultation

This field is for validation purposes and should be left unchanged.

Request A Proposal

This field is for validation purposes and should be left unchanged.

Connect With Our Team

This field is for validation purposes and should be left unchanged.